The 1ST MFF/Tranch-1/Project-1:
The 1st Tranch/Project-I consists of water supply sub-project and recruitment of Design, Supervision and Management Consultants only.
- Recruitment of Design, Supervision and Management Consultants (DSMC)- Completed and demobilised in April, 2016 after completion their contract
- Replacement of 7-Nos. of old PS Tanks into RCC Zonal Tanks- Completed in June, 2012
- Providing 2-Electro Chlorinators for water quality improvements- Installed.
- Providing additional 15,000 Domestic Water Meters- completed for volumetric charges
The 2nd MFF/Tranch-2/Project2-
The 2nd Tranch/Project-2 consists of 3-Sub-project on (i) water supply, (ii) sewerage & sanitation, (iii) Solid Waste Resource Management for Aizawl City and recruitment of Institutional Development Consultants (IDC)
- Water Supply:
- Booster Pumps -2 each at Tlangnuam and Chanmari Booster Pumping Station- Completed.
- 3-New RCC Water reservoirs at Tanhril (350 kL), S Hlimen (400 kL) and Mualpui (750 kL) – Completed.
- Bulk -85 and domestic water meter 20,000 – Completed 20,000 Nos. Of domestic water meters and 55 Nos. of flow meters. 98% completed and in progress.
- Feeder Mains (WS) and Water distribution-107.55 km
- 132 kV Dedicated Power Supply for Greater Aizawl WSS Phase-I & Phase-II
- Sewerage & Sanitation:
- 5-Nos. Cesspool Cleaners – Completed and in operation through AMC.
- 10-Community toilet blocks- Completed at Zemabawk, Thakthing Bazaar, Bawngkawn Bazaar, Bethlehem Vengthlang, Zarkawt, New Market, Thuampui (AMC), College Veng, Dawrpui and Kulikawn.
- Providing, laying, jointing & commissioning of Sewerage Network (SEW)
- Site/Land Development & Approach Road to STP
- 10 MLD Construction of Sewerage Treatment Plant (STP)
- Solid Waste Resource Management:
- Procurement of 1, 32,200 Nos. -Dustbins for segregation of waste into Non-bio degradable and Bio-degradable- 100% Completed and awareness program in progress.
The 3rd MFF/Tranch-3/Project3:
The 3rd Tranch/Project-3 consists of 3-Sub-projects on (i) water supply, (ii) sewerage & sanitation and recruitment of new DSMC.
- Water Supply:
- Feeder mains & distribution networks (255.88 kM)
- 9-New RCC Water reservoirs with allied works and rain water harvesting tanks at various places
- 37-MLD water supply augmentation and construction of treatment plant-
- Preparation of Water Management Plan for Aizawl City including SCADA installation-
- Sewerage & Sanitation:
- Procurement of Bio-digesters
- Procurement of Package Aerated WTP (Johkasou Technology)
- Procurement of SWS for Septage Management-
- Solid Waste Resource Management:
- Procurement of 54 Nos. Vehicle fleets for transportation of wastes-
- Sanitary Landfill development & closure of existing dumping site and Vermi-Composting Plant & Resource Management Centre at Tuirial-
- Procurement of Wheel Barrows-
- Procurement of protection materials-
- Recruitment of new DSMC– Completed and DSMC mobilized from April, 2016.
- Solid Waste Resource Management: